Boggabri Coal Mine - Environmental Noise Monitoring August 2020 20192_R01 Page 4 2 REGULATOR REQUIREMENTS AND NOISE CRITERIA 2.1 Project Approval The most current approval associated with activities at BCM is the ‘Boggabri Coal Project, Project Approval 09_0182 (MOD 7, May 2019)

Blog Detail
  • Boggabri Coal Mine

    Boggabri Coal Mine

    Boggabri Coal Mine - Environmental Noise Monitoring May 2021 21117_R01 Page 4 2 REGULATOR REQUIREMENTS AND NOISE CRITERIA 2.1 Project Approval The most current approval associated with activities at BCM is the ‘Boggabri Coal Project, Project Approval 09_0182 (MOD 7, May 2019)

    Get Price
  • INSTITUTE FOR SUSTAINABLE FUTURES

    INSTITUTE FOR SUSTAINABLE FUTURES

    Calculating global energy sector jobs: 2015 methodology update ii ... TABLE 20 HISTORIC AND PROJECTED PRODUCTIVITY FOR COAL MINING IN CHINA..... 36 TABLE 21 HISTORIC AND PROJECTED PRODUCTIVITY FOR COAL MINING IN INDIA ... BCM Billion Cubic Metres

    Get Price
  • coal ton to bcm « BINQ Mining

    coal ton to bcm « BINQ Mining

    Jun 07, 2013 Mining and earthmoving – Holt . Tons.For most earthmoving and material handling applications, production is calculated by multiply- … for coal mines are calculated by volume (bank cubic meters or … To correct between bank and loose use the following equations. kg/ BCM … More detailed

    Get Price
  • Estimating carbon dioxide emissions from coal mines

    Estimating carbon dioxide emissions from coal mines

    Apr 29, 2021 The Global Coal Mine Tracker uses the 0.017 exclusion factor (1.7%) for all coal types, since emissions from coking coal should still be counted in general inventories. When GCMT data is used for a general compilation, it uses 0.017, but when the compilation is relevant to power sector only, it includes 0.645 for coking coal

    Get Price
  • An investigation into the parameters that affect the swell

    An investigation into the parameters that affect the swell

    Developing a method of calculating the overburden swell factor will greatly affect mine design and reporting. If the swell factor is accurately known there is a possibility that design constraints can be tightened leading to better equipment utilisation, time management and

    Get Price
  • Masama Coal Project Advanced – BCM, Botswana Chamber

    Masama Coal Project Advanced – BCM, Botswana Chamber

    The company CEO, Andre Boje, said, on Wednesday during the mine site visit just outside Medie settlement in Kweneng District – that everything is under control to develop the second coal mine in Botswana after Morupule Coal Mine near Palapye. He said they are just awaiting approval for a mining License to commerce operations in an area of 63km 2

    Get Price
  • iMining | Indonesian Mining Portal

    iMining | Indonesian Mining Portal

    Welcome to iMining.id, the 1st Indonesian mining marketplace. iMining provides a worth and reasonable information and details of Indonesian mining product includes coal, limestone, andesite, construction sand, nickel, gold, etc

    Get Price
  • (PDF) COST ESTIMATION FOR OPEN PIT MINES: TACKLING

    (PDF) COST ESTIMATION FOR OPEN PIT MINES: TACKLING

    Stebbins S A., Leinart J B: Cost Estimating for Surface Mines, Chapter 4.9, published in SME Mining Engineering Handbook, pp.281-293, Society for Mining, Metallurgy, and Exploration, Inc 2011

    Get Price
  • Operating Cost for Miners | SRK Consulting

    Operating Cost for Miners | SRK Consulting

    Operating Cost for Miners | SRK Consulting. Opening a new mine or expanding an existing operation can be a challenging and daunting task. Aside from assessing and evaluating social-environmental concerns and designing the mining and material movement approach, the first question often asked is, how much will it cost us to mine?

    Get Price
  • Stripping ratio | mining | Britannica

    Stripping ratio | mining | Britannica

    Other articles where Stripping ratio is discussed: coal mining: Choosing a mining method: …calculated with the aid of stripping ratios, which represent the amount of waste material that must be removed to extract a given amount of coal. Stripping ratios can also consider the selling price of coal, and a certain minimum profit can be added to the total cost of producing and

    Get Price
  • THE UNIVERSITY OF QUEENSLAND - CORE

    THE UNIVERSITY OF QUEENSLAND - CORE

    BCM), and a wedge volume which is removed by truck and shovel but has a larger cost ($4.50 per BCM) then the prestrip. This thesis examines the economic effect of a change in prestrip height on a strip mine operation that has a single bench prestrip with a bulk dozer push to top of coal. Porter mine is a strip mine

    Get Price
  • bcm ke lcm overburden - le moulin des comperes

    bcm ke lcm overburden - le moulin des comperes

    calculating bcm coal mining calculating bcm coal mining studiareacrema. bcm lcm indonesia coal parting . calculating bcm coal mining . calculating bcm coal mining Grinding Mill China After coal comes out of the ground, it typically goes on a conveyor belt to a

    Get Price
  • Costmine - Industry Standard for Mining Cost Estimating

    Costmine - Industry Standard for Mining Cost Estimating

    Mining Cost Service continues to be a useful reference on a wide range of topics for early stage mine planning through to ‘fill the gaps’ on more detailed studies. Mining Cost Service provides an independent source for information on equipment, quantities and cost for a significant number of mining methods and range of production rates

    Get Price
  • Estimating tons of coal on a property , Kentucky

    Estimating tons of coal on a property , Kentucky

    Sep 19, 2019 1 ton = 2,000 lb. (1.32 62.6 lb 43,560 ft2) / 2,000 lb/ton = 1,799.72 tons/acre-ft, which is rounded off to 1,800 tons/ acre-ft. Because specific gravity varies with rank, different ranks of coal have different conversion factors. Anthracite: specific gravity =

    Get Price
  • Bulking/Swell of Excavated or Mined Materials

    Bulking/Swell of Excavated or Mined Materials

    The bank excavation volume = 200 * 20 * 2 = 8000 m - 8000 Bank cubic metres (BCM) Loose volume = 8000 * 1.4 = 11200 m3 - 11200 Loose cubic metres(LCM) The same excavation in feet: Excavated area is 200 feet long 20 feet wide and 2 feet deep with a listed swell of 40% for the material. Bank volume = 200 * 20 * 2 = 8000 ft

    Get Price
  • Coal Mine Methane Units Converter | US EPA

    Coal Mine Methane Units Converter | US EPA

    Dec 07, 2015 Measure with BTU's. Measure with MegaJoules. To use this form, simply find the appropriate equation, and type the number in the left column. Then hit the TAB button to have the answer generate in the right form field. Cubic meters (m3) = Cubic feet (ft3) Kilograms (kg) = Pounds (lb) Metric tons (tonnes)

    Get Price
  • methods of calculating tonnage in mining

    methods of calculating tonnage in mining

    Posts Related to calculating bcm coal mining calculation of sand cement ratio in m25 mining coal by auger how to calculate cement sand agrreegate ratio. get price Methods for calculating the minimum . amortization tonnage can be expressed as a function of mining rate. The amortization tonnage calculating the optimum mining Methods for

    Get Price
  • Converting Bcm To Mt Coal Mining - Henan Mining

    Converting Bcm To Mt Coal Mining - Henan Mining

    STRIP RATIO (bcm/t) COAL OUTPUT (Mt) Jorong CV: 5300 kcal/kg ... reserves as per mine plan STRIP RATIO (bcm/t) COAL OUTPUT (Mt) 11.4 10.5 6.9 3Q10 4Q10 1Q11 2Q11 6.9. PT. Karbindo Abesyapradhi High Energy Coal from West Sumatra. An average strip ratio of 15.0 Bcm of waste per metric tonne of coal is applicable ... Measured reserves